General Commissioning and Operating Procedure of Ball Tube Mill BBD 4772 Capacity Design tons per hour Ball load 81 tons ... the Mill is provided with the necessary safety devices permitting automatic protection of the installation. ... Check that flame scanners are working properly and should not give false indication for fireout ...
WhatsApp: +86 188380728293. Mill head 4. Trunnion liner 5. Bearing liner The best a ball mill can get FL has installed almost 4000 ball mills at locations worldwide which has given us a unique insight into the stresses and strains arising out of ball mill operations. The large alternating stresses placed on ball mill trunnions and heads are a great example.
WhatsApp: +86 18838072829Based on experience, millliner designs have moved toward more openshell lifter spacing, increased pulp lifter volumetric capacity, and a grate design to facilitate maximizing both pebblecrushing circuit utilization and SAG mill capacity. As a guideline, mill throughput is maximized with shell lifters between ratios of :1 and :1.
WhatsApp: +86 18838072829Check out ball mill installation procedure . Cement crushing plant,process line,mill operation . Crushing News (pdf) procedure of installation vertimill .
WhatsApp: +86 18838072829Mill Lubrication System. 3. OBJECTIVES: To identify the definition and importance of a hydraulic lubrication system. To be familiarized with the lubricant and equipment used in the system. To understand the process and various design of Mill lubrication system. To identify some problems encountered by the system, and formulate some ...
WhatsApp: +86 18838072829girth gear is to be fitted to the mill body in the same position with respect to radial runout, as it had for finish tooth cutting on the machine. In practice this is not usually attainable. After instal lation, the teeth of a girth gear of diameter, for example, can be expected to have a radial runout of 12 rnm and more; Fig. 7.
WhatsApp: +86 18838072829SAG mills generate higher levels of impact reduction and ball mills higher levels of abrading action. A mill lining system serves two purposes: to protect the mill shell from wear caused by the impact and abrasion of the mill charge, and to elevate and tumble the mill contents in the necessary manner to create a grinding action.
WhatsApp: +86 18838072829Set the main breaker switch at the upper right of the electrical panel on the back of the machine to OFF. Using a screwdriver, unlock the two latches on the panel door, unlock the cabinet with the key and open the door. Take sufficient time to check all the components and connectors associated with the circuit boards.
WhatsApp: +86 18838072829Besides ground versus rolled, ball screws come in different accuracy grades that you should be aware of: C0 3um or ″ per 300 mm / 12″. C3 7um or ″ per 300 mm / 12″. C5 14um or ″ per 300 mm / 12″. This refers to how close the position will be after the screw has turned through 12″ of motion.
WhatsApp: +86 18838072829Install the jack screws, if provided, in the gear counterbore before mounting the gear to the. shell assembly. 32. Tel: (+27) 11 454 4177 Fax: (+27)11 454 4178 projects f EL BROCAL. Mill Installation Manual. 16x22ft, 2800kW Ball Mill. Special Tools Needed for the Gear Pinion Installation.
WhatsApp: +86 18838072829out I dn 11 s 110 U .10 ) J e p .31 a pot u aq u P I I e 1 sul s a s e q (l K .10 A a put: 11.) e a .10 J u o t 1 e J! p U O D st u ! 1 1 a 1 d 1 11 n a: .10 J p ed pue p 10 A e 01 tap .10 u I S' n 0 31 N lit aq up D .taqqtil oöuodg 10 as n st b JO poo b u ed pue p P o q aja a q ) oq a D Ed s p 10 A ut 01 s p os soci u
WhatsApp: +86 18838072829This includes 1) the title of the procedure, 2) an SOP identification number, 3) date of issue or revision, 4) the name of the agency/division/branch the SOP applies to, and 5) the signatures of those who prepared and approved of the SOP. This can be formatted however you like, as long as the information is clear.
WhatsApp: +86 18838072829The third step in crushing, or tertiary reduction, depends upon what is required. Twoinch or smaller pieces from the secondary crushers may be fed direct to stamps, rod mills, or ball mills, but it is more usual to use a third dry crusher to reduce the ore to ½ or 5/8in. size before wet crushing, particularly in the case of ball milling.
WhatsApp: +86 18838072829The existing Ball mill system is envisaged to be used in combination with Roller Press and VSK separator in semi finish mode. The rejects from VSK separator will go to Roller press. The product from the VSK separator will go to mill via a solid flow meter. The existing OSEPA separator along with product collection bag filter is envisaged to
WhatsApp: +86 18838072829Set up sub soles and sole as above for pinion mount. Place the pinion. Using Feeler gauges check to ensure a root gap of 6MM both ends move pinion into position as close as possible. Blue the Teeth on girth gear and roll mill using the turfers and check the coverage of the bearing blue.
WhatsApp: +86 18838072829Robot Motion. Manual motion is only permitted in set up mode and is recommended only with limited speed of motion. High speed is permitted but 500mm clearance for the safety of the operator is required. This requires the set up and verification of DCS/keep out zone (s).
WhatsApp: +86 18838072829The Tata Power Company Ltd Lock Out Tag Out (LOTO) Document Title Procedure Document Ref No: TPSMS/CSP/LOTO/001 Rev 01 Date of Issue: 01/01/2016 Contents Section Description Page No. OBJECTIVE 3 SCOPE 3 EXPECTED RESULTS 3 ACCOUNTABILITY RESPONSIBILTIY 3 GLOSSARY/ DEFINITIONS 3 PROCEDURE 6 RECORDS 10
WhatsApp: +86 18838072829Get the fundamentals and learn best practices to keep your mills optimized for reliability, efficiency, and maintenance costs. This 3day seminar covers the technology and bestpractice maintenance techniques and methods for Ball and Vertical mill systems. The course offers classroom instruction from our FL specialists and case studies ...
WhatsApp: +86 1883807282912. If the rate of feed increased, coarser product will be obtained and if speed of rotation is increased the fineness for a given capacity is increases. During grinding, the balls themselves wear and are continuously replaced by new ones so that mill contains balls of various ages. Ball mill produces 1 to 50 ton/hr of powder and energy requirement of the ball mill is about 16 kwh/ton.
WhatsApp: +86 18838072829The only types of tools that are permitted to be used in the manual mills are listed below. The machine operator should review and learn the information given in the separate [MILL CUTTING TOOLS SOP] to determine when to use what type of cutting tools. Mill cutting tools can only be held in the machine with a collet or Drill chuck:
WhatsApp: +86 18838072829The mine is closed and now you need to know how to put the SAG or Large Ball Mill in care and maintenance does not have to be complicated to the point where you need bridge erection equipment for lifting a Mill (AG/SAG/Rod/Ball). You actually need to lift a car higher than a mill. All you need to do is jack the mill up about 1/2″.
WhatsApp: +86 18838072829